BUILDING STRUCTURES
GUTES & GOOD & BAD SEPARATION
Whoever wants to create something new from the old must plan and implement integrally
Nearly every professional disassembly or core removal of buildings or parts of buildings today is associated with comprehensive hazardous substance remediation. The focus here is on a holistic view of the hazard situation. We specialise in all types of partial or complete dismantling and dismantling of structures containing pollutants in renovation and demolition projects.
After completion of our project work, it is ensured that the areas and structures are substantially pollutant-free for trouble-free further processing available.
PROJECTS:
ASTORIA HOTEL
LEIPZIG
Demolition and core removal
- 16.000 m² usable space
70.000 m³ enclosed space
with upstream hazardous material remediation
AG: Vivion AG
PD: 13 month
AV: 3.5 M€
GARDENING LEHNER
NUREMBERG
Pollutant remediation & complete abort
- approx. 10,000 m³ of enclosed space
AG: former Gartenbau Lehner GmbH
PD: 2 month
AV: 0.2 M€
UNIVERSITY HOSPITAL MUENSTER
Muenster
KMF, asbestos removal, gutting
- Mensa building pollution abatement & gutting
in existing use of the EC
AG: Müssmann GmbH
PD: 4 months
AV: 0.3 M€