INDUSTRIAL PLANTS

TIME IS YOUR MONEY

Minimized interruption of use as the highest requirement

 

The remediation and purification of industrial structures implies a multitude of individual challenges.

In addition to ensuring trouble-free operation and avoiding under use, the main focus is on compliance with safety requirements in industrial plants. This includes work in explosion-protected environments, separation of components and connections with minimum measures, as well as work in with non-fireand spark-forming separation processes.

PROJEKTE:

APLUS-GMBH_REFERENZ_FLUGHAFEN-TEMPELHOF-BERLIN_600x600

FORMER. AIRPORT TEMPELHOF

Berlin

Pollutant remediation

  • Pipe, Electrical,
    Media channel system

AG: Land Berlin
PD: 14 months
AV: 4.3 M€

APLUS-GMBH_REFERENZ_KERNKRAFTWERK-LEIBSTADT

NUCLEAR POWER PLANT

Leibstadt, SWITZERLAND

Pollutant remediation

  • 20,000 t asbestos removal
    and cooling tower remediation

AG: Kernkraftwerk Leibstadt AG
PD: 2.5 months
AV: 6.1 M€

APLUS-GMBH_REFERENZ_KERNKRAFTWERK-NEURATH

POWER PLANT NEU- RATH

NORTH RHINE WESTPHALIA

cooling tower internals

  • Production & Assembly
    50.000 m³ cooling packages

AG: RWE
PD: 2 month
AV: 1.1 M€