INDUSTRIAL PLANTS
TIME IS YOUR MONEY
Minimized interruption of use as the highest requirement
The remediation and purification of industrial structures implies a multitude of individual challenges.
In addition to ensuring trouble-free operation and avoiding under use, the main focus is on compliance with safety requirements in industrial plants. This includes work in explosion-protected environments, separation of components and connections with minimum measures, as well as work in with non-fireand spark-forming separation processes.
PROJEKTE:
FORMER. AIRPORT TEMPELHOF
Berlin
Pollutant remediation
- Pipe, Electrical,
Media channel system
AG: Land Berlin
PD: 14 months
AV: 4.3 M€
NUCLEAR POWER PLANT
Leibstadt, SWITZERLAND
Pollutant remediation
- 20,000 t asbestos removal
and cooling tower remediation
AG: Kernkraftwerk Leibstadt AG
PD: 2.5 months
AV: 6.1 M€
POWER PLANT NEU- RATH
NORTH RHINE WESTPHALIA
cooling tower internals
- Production & Assembly
50.000 m³ cooling packages
AG: RWE
PD: 2 month
AV: 1.1 M€